Power generated at the source, consumed as compute
BitRock operates off-grid natural-gas generation next to the gas source in County of Newell, Alberta, supplying a modular data center for AI/HPC and blockchain compute. Phase 1 is commissioned at 10 MW.
- Location
- County of Newell
- Brooks–Tilley area, Alberta, Canada
- Project stage
- Phase 1 operational
- Phase 2 build-out in progress
- Phase 1 capacity
- 10 MW
- 30 × 400 kW gensets, 12 MW nameplate
- All-in power
- ~US$0.03/kWh
- Estimate; varies with gas price
The model
Gas, power and compute on one site
Fuel is bought or tapped at the wellhead, converted on site, and consumed locally — with no grid interconnection in the path.
- 01
Natural Gas
Purchased from gas retailers or the Bow River gas co-op, or tapped at the wellhead from acquired gas fields.
- 02
On-Site Generation
Skid-mounted gas gensets deployed for off-grid self-supply — no transmission or distribution fees.
- 03
Data Center
Modular containerized halls with air or immersion cooling, medium-voltage distribution and SuperNet fiber access.
- 04
AI/HPC & Blockchain Compute
Two revenue lines: self-mining Bitcoin, and AI/HPC compute colocation where the client brings its own GPUs.
Why Alberta
Low-cost gas, cold air, and no interconnection queue
Off-grid self-supply avoids transmission and distribution fees as well as interconnection queues.
- In July 2025 Alberta's average gas price was ~C$0.78/GJ (ICE NGX AB-NIT Same Day Index), implying a fuel cost of ~C$0.009/kWh.
- Generation cost at current gas price is approximately 1–2 ¢/kWh, varying with gas price and genset efficiency.
- Alberta has capped data-center grid access, with the Phase II queue extending to ~2027.
- Cold winters and cool, dry summers assist cooling and support low PUE.
- The site sits on the Trans-Canada Highway 1 and the CP Rail mainline, with Alberta SuperNet fiber passing nearby.

Compute
Two workload lines on one power asset
Self-mining monetises power today; AI/HPC colocation upgrades the same halls once offtake and GPUs are secured. Both lines can run in parallel.
Self-mining Bitcoin
AI/HPC colocation
Infrastructure partnership


Partnership
Equity, EPC, colocation, rack leasing and power-asset cooperation
The project provides the site, cleared approvals, integrated low-cost power, a commissioned Phase 1 asset and a local engineering and O&M team. We are seeking project capital, compute and colocation clients, AI compute and technology partners, and gas supply and equipment resources.
Project information is provided for preliminary discussion and is subject to verification, due diligence and applicable law.